Quantcast
Channel: RFPMart - Rhode Island RFPs
Viewing all articles
Browse latest Browse all 4237

US-FED-00000302390 - Capstan Main Frame Fabrication - Deadline March 21,2025

$
0
0
Amendment –0002Industry posed questions answered by the technical team.Extension of RFQ closing to March 21st, 2025 at 2:00pm ET.Question 1: Can the Government please confirm if the post–weld stress relief is required given the application for an equipment facility?Answer 1: Yes. Post weld stress relief is required per the drawing 53X–01–100. The application of the Main Frame is to be built into a Fleet asset by the Towed Array Handling Equipment Facility.Question 2: Can the Government please confirm the material specification for Item 14? It is listed as ASTM A300, but that specification is for testing. We are verifying it is S–1.Answer 2: Recommend replacing with ASTM A500, Grade B– Cold Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes as it is appurtenant to ASTM A26, the steel spec for the surrounding materia

Viewing all articles
Browse latest Browse all 4237

Latest Images

Trending Articles



Latest Images