(1) Vendor needs to provide broadband services to the government authority located in Rhode Island.– Latency must be less than 100ms.– Provide end–to–end fiber.– Improve speed, resilience and latency of current last–mile networks to ensure these networks can support 100/100 Mbps average real speeds for all users, and is scalable to 1/1 Gbps.– If it is determined to be impracticable for a Project to deliver services at 100/100 Mbps due to geography, topography or excessive cost, the proposed Project must be designed so that it reliably meets or exceeds 100/20 Mbps and is scalable to meet a minimum of 100/100 Mbps in the future.(2) All question must be submitted no later than July 16, 2024.(3) A contract period will be for one year.
↧