(1) Vendor needs to provide water pollution control facility subaqueous outfall inspection services to the government authority located in East Providence, RI. – Watercraft and related support systems required fir access to and location of the submerged outfall structure.– Side Scan Sonar for Location of the Outfall Structure (as needed)– Dive Team with required safety apparatus and safety equipment necessary to perform all aspects of the work.– Video inspection and recording equipment including one, or a combination, of the following:– Handheld Underwater Video Camera Equipment– Remotely Operated Underwater Video Camera Equipment (ROV’s)– The Contractor shall provide the City and the City’s Engineer at least two (2) weeks advanced noticed prior to any planned work.
↧