(1) Vendor needs to provide commissioning agent services to the government authority located in East Providence, RI.
- The department of labor, organize, coordinate and conduct a controls integration meeting with the mechanical, electrical and systems control engineers.
- Specifications shall include, but shall not be limited to, requirements for commissioning
submittals, start up and checkout test plans, functional test development support, pre-functional
checklists and functional test execution, training plan development and execution, operations and
maintenance manuals, as-built drawings and coordination among subtrades. - To be used for the installation review, start up and pre-functional testing process and required integration between these activities for each piece of equipment, subsystem and system.
- Describe the functional performance testing process, including prerequisites and any special equipment or instrumentation needed to obtain necessary measurements during performance testing.
- Include requirements for deferred seasonal functional performance testing as appropriate.
↧